Clean Lahore is Green Lahore

Both the contractors of LWMC mechanicaly sweep major roads as follows.

Albayrak

  • No of Roads = 124
  • No of Kilometers =
  • No of Vehicles Used = 31

Ozpak

  • No of Roads =
  • No of Kilometers =
  • No of Vehicles Used =

Updated Plan of Mechanical Sweeping (Morning)  

Sr. No. Name of Road Start Point End Point One side Length (meters) No. of Sides Total Length (meters)
Route 01 (6 Cu.M)
1 Ring Road Niazi InterChange Mehmood Booti Interchange Bridge 10400 4 41600
2 Mehmood Booti Interchange MCW, Loops & Ramps 1574 4 6296
Sub-Total of Route No. 01 47896
Route 02 (6 Cu.M)
3 Ring Road Mehmood Booti Interchange Bridge Abdullal Gul Interchange 11160 4 44640
Sub-Total of Route No. 02 44640
Route 03 (6 Cu.M)
4 Ring Road Abdullal Gul Interchange Bhatta Chowk 4100 8 32800
Sub-Total of Route No. 03 32800
Route 04 (6 Cu.M)
5 Harbanspura Interchange MCW, Loops & Ramps 1143 4 4572
6 Quaid-e-Azam Interchange MCW, Loops & Ramps 2496 2 4992
7 Bhatta chowk Interchange MCW, Loops & Ramps 3000 4 12000
8 Nawaz Sharif Interchange MCW, Loops & Ramps 7000 4 28000
9 Kamahan Interchange MCW, Loops & Ramps 1900 4 7600
Sub-Total of Route No. 04 57164
Route 05 (6 Cu.M)
10 Mall Road PMG Chowk Canal Road 5172 4 20688
Sub-Total of Route No. 05 20688
Route 06 (5 Cu.M)
11 Ring Road Bhatta Chowk Kamahan Distributory 6600 4 26400
Sub-Total of Route No. 06 26400
Route 07 (5 Cu.M)
12 GOR-1 Inner Roads 5180 2 10360
Sub-Total of Route No. 07 10360
Total Length (meters) 239948

Mechanically Sweeping 1276 km / day.

Mapping of Roads for Mechanical Sweeping