Mechanical Washing Detail
Lead to Clean Lead to Green
Both the contractors of LWMC mechanicaly wash major roads as follows.
Albayrak
- No of Roads = 129
- No of Kilometers =112KM/Day
- No of Vehicles Used = 14
Ozpak
- No of Roads =
- No of Kilometers =
- No of Vehicles Used =
Mechanical Washing Plan (Night)
DAY 1 (Monday) | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Canal Road | Ferozpur Road | Mall Road | 3.51 | 2 | 7.02 | |
Total Length (km) | 7.02 | ||||||
Team-2 | Canal Road | Ferozpur Road | Mall Road | 3.51 | 2 | 7.02 | |
Total Length (km) | 7.02 | ||||||
Team-3 | Canal Road | Mall Road | Mugal Pura Underpass | 3.67 | 2 | 7.34 | |
Total Length (km) | 7.34 | ||||||
Team-4 | Canal Road | Mall Road | Mugal Pura Underpass | 3.67 | 2 | 7.34 | |
Total Length (km) | 7.34 | ||||||
Team-5 | Anarkali Road | Jain Mandar Chowk | Circular Road | 1.78 | 2 | 3.56 | |
Total Length (km) | 3.56 | ||||||
Total Length Covered (km) | 32.28 | ||||||
DAY 2 | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Mall Road | PMG Chowk | Club Chowk (Davis Road) | 4.15 | 2 | 8.3 | |
Total Length (km) | 8.3 | ||||||
Team-2 | Mall Road | PMG Chowk | Club Chowk (Davis Road) | 4.15 | 2 | 8.3 | |
Total Length (km) | 8.3 | ||||||
Team-3 | Mall Road | Club Chowk (Davis Road) | Canal Road | 1 | 4 | 4 | |
Jail Road | Canal Road | Aiwan-e-Tijarat Road | 1.45 | 2 | 2.9 | ||
Total Length (km) | 6.9 | ||||||
Team-4 | Jail Road | Canal Road | Aiwan-e-Tijarat Road | 1.45 | 2 | 2.9 | |
Jail Road | Aiwan-e-Tijarat Road | Qartaba Chowk | 1.49 | 4 | 5.96 | ||
Total Length (km) | 8.86 | ||||||
Total Length Covered (km) | 32.36 | ||||||
DAY 3 | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Main Boulevard Gulberg | Kalma Chowk | Jail Road | 3.85 | 2 | 7.7 | |
Total Length (km) | 7.7 | ||||||
Team-2 | Main Boulevard Gulberg | Kalma Chowk | Jail Road | 3.85 | 2 | 7.7 | |
Total Length (km) | 7.7 | ||||||
Team-3 | Allama Iqbal Road | Canal Road | Railway Station | 3.27 | 2 | 6.54 | |
Railway Station | Round About | 0.6 | 1 | 0.6 | |||
Total Length (km) | 7.14 | ||||||
Team-4 | Circular Road | Azadi chowk | 2 Moria Pull | 2.2 | 4 | 8.8 | |
Total Length (km) | 8.8 | ||||||
Total Length Covered (km) | 31.34 | ||||||
DAY 4 (Thursday) | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Upper Mall Road | Canal Road | Mian Mir Bridge | 1.21 | 4 | 4.84 | |
Zafar Ali Road | Canal Road | Jail Road | 0.87 | 4 | 3.48 | ||
Total Length (km) | 8.32 | ||||||
Team-2 | Jail Road | Canal Road | Sher Pao Bridge (Railway Lines) | 1.94 | 4 | 7.76 | |
Total Length (km) | 7.76 | ||||||
Team-3 | Noor Jahan Road | Qaddafi Stadium Roundabout | Hussain Chowk | 1.1 | 4 | 4.4 | |
Liberty Market | Liberty Market | 0.47 | 2 | 0.94 | |||
MM Alam Road | Ali Zaib Road | Hussain Chowk | 0.52 | 4 | 2.08 | ||
Total Length (km) | 7.42 | ||||||
Team-4 | MM Alam Road | Hussain Chowk | Main Boulevard Gulberg | 1.93 | 2 | 3.86 | |
Gulberg Main Market | Main Market | 0.52 | 2 | 1.04 | |||
Hali Road | Qaddafi Stadium Roundabout | Gulberg Main Market | 1.52 | 2 | 3.04 | ||
Total Length (km) | 7.94 | ||||||
Total Length Covered (km) | 31.44 | ||||||
DAY 5 | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Ali Zaib Road | Center Point | Gurmanget Road | 2 | 4 | 8 | |
Total Length (km) | 8 | ||||||
Team 2 | Gurmanget Road | Jinnah Flyover | College Road | 2.48 | 2 | 4.96 | |
Mehmood Ali Kasori Road | Hussain Chowk | Gurmanget Road | 0.69 | 2 | 1.38 | ||
Ghalib Road | MM Alam Road | Main Boulevard Gulberg | 0.76 | 2 | 1.52 | ||
Total Length (km) | 7.86 | ||||||
Team-3 | Davis Road | Mall Road | Shimla Pahari | 1.28 | 2 | 2.56 | |
Egerton Road | Shimla Pahari | Holiday Inn | 0.5 | 4 | 2 | ||
Holiday Inn | Mall Road | 0.7 | 2 | 1.4 | |||
Aiwan-e-Iqbal Road | Mall Road | Holiday Inn | 0.39 | 2 | 0.78 | ||
Punjab Assembly Road | Mall Road | Cooper Road | 0.46 | 2 | 0.92 | ||
Total Length (km) | 7.66 | ||||||
Team-4 | Shadman Main Boulevard | Jail Road | Fatima Memorial Hospital (2nd Roundabout | 1.2 | 2 | 2.4 | |
Aiwan-e-Tijarat Road | Jail Road | Mall Road | 1.5 | 2 | 3 | ||
Ashiq Hussain Road | Shama Chowk | Mental Hospital | 1.4 | 2 | 2.8 | ||
Total Length (km) | 8.2 | ||||||
Team-5 | Anarkali Road | Jain Mandar Chowk | Circular Road | 1.78 | 2 | 3.56 | |
Total Length (km) | 3.56 | ||||||
Total Length Covered (km) | 35.28 | ||||||
DAY 6 | |||||||
Teams | Roads | Start Point | End Point | Length (km) | No of Sides | Total Length (km) | |
Team-1 | Metro Bus Track Outside | Niazi Interchange | Jain Mandar Chowk | 5.5 | 1 | 5.5 | |
Lytton Road | Jain Mandar Chowk | Qartaba Chowk | 1.41 | 2 | 2.82 | ||
Total Length (km) | 8.32 | ||||||
Team-2 | Metro Bus Track Outside | Qartaba Chowk | Naseer Abad Metro Bus Station | 7.36 | 1 | 7.36 | |
Total Length (km) | 7.36 | ||||||
Team-3 | Metro Bus Track Outside | Naseer Abad Metro Bus Station | Kamaha-Lidher Road | 7.9 | 1 | 7.9 | |
Total Length (km) | 7.9 | ||||||
Team-4 | Ferozpur Road | Kamaha-Lidher Road | Kacha Kahna Road | 8 | 1 | 8 | |
Total Length (km) | 8 | ||||||
Team-5 | New Azadi Chowk Interchange | Main CarriageWay (MCW), Loops & Ramps | 2.47 | 4 | 9.88 | ||
Total Length (km) | 9.88 | ||||||
Total Length Covered (km) | 41.46 | ||||||
Day 7 | |||||||
Teams | Road Name | Start Point | End Point | Length of 1 Side (meters) | No of Sides | Total Length (meters) | |
Team-1 | Ghari Shahu Flyover(Shalimar Road) | Allama Iqbal Road | Cooperative Store Chowk | 1.304 | 2 | 2.608 | |
GT Road | Cooperative Store Chk | Shalimar Link Road | 3.25 | 2 | 6.5 | ||
Total Length (K-meters) | 9.108 | ||||||
Team-2 | Lake Road | Chuburji | Jain Mandar Chowk | 0.566 | 4 | 2.264 | |
Bank Road | Crust Road | Istanbul Chowk | 0.672 | 2 | 1.344 | ||
Library Road | Nabha Road | Mall Road | 0.35 | 2 | 0.7 | ||
Queen's Road | Chairing Cross | Qartaba Chowk | 1.6 | 2 | 3.2 | ||
Total Length (K-meters) | 7.508 | ||||||
Team-3 | GT Road | Shalimar Link Road | Cooperative Store Chk | 3.25 | 2 | 6.5 | |
Ghari Shahu Flyover(Shalimar Road) | Cooperative Store Chowk | Allama Iqbal Road | 1.304 | 2 | 2.608 | ||
Total Length (K-meters) | 9.108 | ||||||
Team-4 | GT Road | Shalimar Link Road | Quaid-e-Azam Interchange | 5.02 | 2 | 10.04 | |
Total Length (K-meters) | 10.04 | ||||||
Total Length Covered (Km) | 35.764 | ||||||
Over all Total Length Covered (Km) | 239.924 | ||||||